Phone: +86-13816327892   E-mail: vonfo@ksvonfo.com

Professional Mango processing turnkey project manufacturer

Over 15 years of Mango processing production line design ,manufacture and installation experience
Top quality with reasonable price
Supports on-site or remote guided installation and commissioning
7X24 hours after-sales and technical support

Mango Production Line Description

Raw material of Mango processing line
-Fresh Mango
End product of Mango processing line
-Concentrated Mango pulp
-Mango juice
Processing Capacity of Mango processing line
-10T-1000T/D
Container of Mango processing line
-Aseptic bag
-Tin can
-Carton
-PET or glass bottles

Mango Production Line Flowchart

1.Receiving, elevating
2.Washing, sorting
3.De-stoning&peeling
4.Preheating
5.Refining
6.Standardizing
7.Decanting
8.Homogenizing
9.Degassing
10.UHT Sterilizing
11.Aseptic bag filling
12.Warehouse

Mango Production Line Key Machine

Fresh Mango Pre-Treatment System

-Mango washing and sorting machine
-Mango destone and peeling machine
-Mango pulping and preheating machine
-Mango pulp standardized and decanter centrifugal separator machine

Mango Pulp Concentration and Sterilization System

-Composed of vacuum evaporator and Tube in tube sterilizer
-Full-automatic control to ensure high quality mango pulp/juice

Mango Pulp/Juice Filling System

-Aseptic filling machine for 5KG-220KG aseptic bag(Most popular package)
-Tin can
-Carton
-PET or glass bottles-

CIP System for Mango Paste Processing Line

More >>
-For clean whole mango processing line after production finished
-Small scale whole-set type CIP system
-Separate type vertical CIP system

BIB Filler(BIB fillling machine)

The BIB bag-in-box aseptic filling machine is a small bag aseptic filling machine specially developed by our company for small packages below 50 liters in combination with Italian technology, which is mainly composed of aseptic filling system, metering system, etc.It is specially used for the filling of 1-50L aseptic bags. The packaging bags are aluminum-plastic composite aseptic bags. The materials after sterilization are subject to such operations as cap opening, filling and capping, which are completed by the mechanical hand in the aseptic room, so as to avoid environmental contamination and achieve the effect of aseptic filling. It is widely applied in such industries as fruit juice, jam, dairy, coffee, fruit wine, etc.

Why Choose VONFO Mango Production Line

  • Professional Team
    A professional team with over 15 years of experience provides the most suitable mango production line design and manufacturing process.​​​​​​​
  • Reasonable Price and Top Quality​​​​​​​
    Provide factory direct sales prices based on the best quality to save your costs.​​​​​​​
  • Timely after-sales and Technical Support​​​​​​​
    7X24 hours, technical and after-sales support from a professional team​​​​​​​
  • Successful Cases​​​​​​​
    There are more than 100 sets dairy and beverage production line in normal operation around the world, including the United States, Europe, the Middle East and Africa, and the quality has been endorsed by customers.​​​​​​​

Cooperative Partner

SPX FLOW,GEA,Alfa Laval,Siemens,Omron,SpiraxSarco
Danone,coca-cola,Nestle,Heinz,Mengniu Dairy,Yili Group,Bright dairy,
WANT WANT,Master Kong
Big Easy Blends(USA),Forage project(USA), Mineral Logic( USA).
5 Star Drinks(Ghana), Fedek group(Ghana)

REQUEST A QUOTE NOW

24-hours-online professional pre-sales consultation, after-sales services & prompt feedback.
FAQs
  • How to choose suitable mango production line?
    Created with Sketch.
    形状 Created with Sketch.
    Based on capacity, packaged form and other requirements you provided, our engineers will design whole Tomato paste production line for you accordingly .
  • Can your factory produce mango production line according to our drawings or design?
    Created with Sketch.
    形状 Created with Sketch.
    Yes, of course we can
  • How to control the whole mango production line?
    Created with Sketch.
    形状 Created with Sketch.
    You can choose semi-automatic control or full-automatic control base on your actual demand and budget.
  • How long is the delivery time?
    Created with Sketch.
    形状 Created with Sketch.
    It takes about 60-90 days for whole mango production line manufacturing.
  • How to install and debug the mango production line?
    Created with Sketch.
    形状 Created with Sketch.
    After whole line equipment arrives at your factory and other support facilities in place , our company will send engineer team to the site for installation and debugging.
    If you have a professional team and can install by yourself, then our company can remotely install and debug through video with your team.
NO.1301 Fengxing Road, Huaqiao Town, Kunshan City, Jiangsu Province.
+86-18602119362 (Cell/WhatsApp)
+86-13816327892 (Cell/WhatsApp)

SUBSCRIBE

Sign up for our mailing list to get latest updates and offers.

PRODUCTS

CONTACT US
Contact us
Copyright © Kunshan vonfo machinery co.,ltd. All Rights Reserved.