Phone: +86-13816327892   E-mail: vonfo@ksvonfo.com

Professional UHT Milk Turnkey Project Manufacturer

Over 15 years of UHT milk production line design ,manufacture and installation experience
Top quality with reasonable price
Supports on-site or remote guided installation and commissioning
7X24 hours after-sales and technical support

UHT Milk Production Line Description

Raw material of UHT milk processing line
- Fresh milk
End product of UHT milk processing line
- Whole UHT milk ,Skimmed UHT milk
Processing Capacity of UHT milk processing line
-1000L/H- 200,00L/H
Container of UHT milk processing line
-Aseptic pouches:Tetra pack aseptic pillow pouches and PrePak pouches, shelf life 1-6 months in room temperature
-Bottles: PE material bottles, shelf life 6 months in room temperature
-Aseptic Cartons: Most popular package for UHT milk, shelf life 6-12 Months in room temperature

UHT Milk Production Line Flowchart

1. Raw milk storage or milk Powder Dissolving system
2. Homogenization and UHT sterilization Section
3. Aseptic Filling & Packaging system
4. CIP system
5. Water Treatment system
6. Ice water system
7.Compressed air system
8. Steam Boiler

UHT Milk Production Line Key Machine

Fresh Milk Collection, Cooling and Storage System

-If your fresh milk capacity per day is low , then the milk cooling tank will be used for cooling and storage fresh milk .
-If your fresh milk capacity per day is high, then need use the plate heat exchanger( PHE ) to cool down fresh milk to 4℃ and pump to milk storage tank

Fresh Milk UHT Sterilization System

-Composed of Full-automatic ultra-high temperature tubular sterilizer, homogenizer, and centrifuge separator(Optional by client).
-Cone equipment for whole UHT milk processing line
-Fresh milk 4℃ inlet→55-65℃ homogenizer/separator→137℃/4S pasteurization-20℃ outlet

UHT Milk Aseptic Filling System

-UHT milk filled into pouches,bottles and cartons with different aseptic filling machine
-Aseptic filling under aseptic condition
-1-12 months shelf life base on different package in room temperature

CIP System For UHT Milk Processing Line

-For clean whole UHT milk processing line after production finished
-Small scale whole-set type CIP system
-Separate type vertical CIP system

Why Choose VONFO UHT Milk Production Line

  • Professional Team
    A professional team with over 15 years of experience provides the most suitable UHT milk production line design and manufacturing process.​​​​​​​
  • Reasonable Price and Top Quality​​​​​​​
    Provide factory direct sales prices based on the best quality to save your costs.​​​​​​​
  • Timely after-sales and Technical Support​​​​​​​
    7X24 hours, technical and after-sales support from a professional team​​​​​​​
  • Successful Cases​​​​​​​
    There are more than 100 sets dairy and beverage production line in normal operation around the world, including the United States, Europe, the Middle East and Africa, and the quality has been endorsed by customers.​​​​​​​

Cooperative Partner

SPX FLOW,GEA,Alfa Laval,Siemens,Omron,SpiraxSarco
Danone,coca-cola,Nestle,Heinz,Mengniu Dairy,Yili Group,Bright dairy,
WANT WANT,Master Kong
Big Easy Blends(USA),Forage project(USA), Mineral Logic( USA).
5 Star Drinks(Ghana), Fedek group(Ghana)

REQUEST A QUOTE NOW

24-hours-online professional pre-sales consultation, after-sales services & prompt feedback.
FAQs
  • How to choose suitable UHT milk production line?
    Created with Sketch.
    形状 Created with Sketch.
    Based on capacity, packaged form and other requirements you provided, our engineers will design whole UHT milk production line for you accordingly .
  • Can your factory produce UHT milk production line according to our drawings or design?
    Created with Sketch.
    形状 Created with Sketch.
    Yes, of course we can
  • How to control the whole UHT milk production line?
    Created with Sketch.
    形状 Created with Sketch.
    The whole UHT milk production line are fully automatic and controlled by PLC to avoid the risk of the second pollution base on the strict hygiene requirements
  • How long is the delivery time?
    Created with Sketch.
    形状 Created with Sketch.
    It takes about 60-90 days for whole UHT milk production line manufacturing.
  • How to install and debug the UHT milk production line?
    Created with Sketch.
    形状 Created with Sketch.
    After whole line equipment arrives at your factory and other support facilities in place , our company will send engineer team to the site for installation and debugging.
    If you have a professional team and can install by yourself, then our company can remotely install and debug through video with your team.
NO.1301 Fengxing Road, Huaqiao Town, Kunshan City, Jiangsu Province.
+86-18602119362 (Cell/WhatsApp)
+86-13816327892 (Cell/WhatsApp)

SUBSCRIBE

Sign up for our mailing list to get latest updates and offers.

PRODUCTS

CONTACT US
Contact us
Copyright © Kunshan vonfo machinery co.,ltd. All Rights Reserved.