Over 15 years of yogurt production line design ,manufacture and installation experience Top quality with reasonable price Supports on-site or remote guided installation and commissioning 7X24 hours after-sales and technical support
Raw material of yogurt processing line - Fresh milk or powdered milk End product of yogurt milk processing line - Stirred yogurt,which is fermented before filled into package - Set-yogurt,which is fermented after filled into package Processing Capacity of yogurt processing line -1T/D - 500T/D Ingredients used in yogurt processing line -fruit materials, sugar or sweetener, and stabilizers(pectin, gelatin, starch, agar, etc.) Container of yogurt processing line -Bottles -Plastic cups -Plastic bags
1.Raw milk storage system/milk powder and sugar dissolving system 2. Preparation and mixing system 3. Homogenization and pasteurization Section 4. Fermentation Section 5. Yogurt Filling & Packaging Section 6. CIP system 7. Water Treatment system 8. Ice water system 9. Compressed air system 10. Steam Boiler
-If your fresh milk capacity per day is low , then the milk cooling tank will be used for cooling and storage fresh milk .
-If your fresh milk capacity per day is high, then need use the plate heat exchanger( PHE ) to cool down fresh milk to 4℃ and pump to milk storage tank
Milk Powder and Ingredients Dissolving System
(Milk Powder as Raw Material)
-Composed of mixing tank,high shear emulsification tank,water powder mixer and matched pumps, dissolving milk powder or ingredients with hot water . - Ingredients dissolving system also needed when fresh milk as raw material
Yogurt Pasteurization System
-Composed of plate pasteurizer, homogenizer, and centrifuge separator(Optional by client). -Cone equipment for whole yogurt processing line -Fresh milk →55-65℃ homgeonzer/separator→90-95℃/300S pasteurization-43℃outlet Yogurt fermentation system: -Stirred yogurt will fermentation in fermentation tank at 41-43℃for 2-3 hours -Set yogurt will fermentation after filled into package in fermentation chamber at 41-43℃for 2-3 hours
Yogurt Fermentation System
-Stirred yogurt will fermentation in fermentation tank at 41-43℃for 2-3 hours -Set yogurt will fermentation after filled into package in fermentation chamber at 41-43℃for 2-3 hours
Yogurt Filling and Packing System
-Bottles(Most for set yogurt,filled in 40℃,send to fermentation chamber after filled ) -Plastic cups(Most for stirred yogurt,filled in 4-6℃) -Plastic bags
CIP System for Yogurt Processing Line
-For clean whole pasteurized milk processing line after production finished -Small scale whole-set type CIP system -Separate type vertical CIP system
Why Choose VONFO Yogurt Processing Line
Professional Team
A professional team with over 15 years of experience provides the most suitable yogurt production line design and manufacturing process.
Reasonable Price and Top Quality
Provide factory direct sales prices based on the best quality to save your costs.
Timely after-sales and Technical Support
7X24 hours, technical and after-sales support from a professional team
Successful Cases
There are more than 100 sets dairy and beverage production line in normal operation around the world, including the United States, Europe, the Middle East and Africa, and the quality has been endorsed by customers.
Cooperative Partner
SPX FLOW,GEA,Alfa Laval,Siemens,Omron,SpiraxSarco Danone,coca-cola,Nestle,Heinz,Mengniu Dairy,Yili Group,Bright dairy, WANT WANT,Master Kong Big Easy Blends(USA),Forage project(USA), Mineral Logic( USA). 5 Star Drinks(Ghana), Fedek group(Ghana)
Based on capacity, packaged form and other requirements you provided, our engineers will design whole yogurt production line for you accordingly.
Can your factory produce yogurt production line according to our drawings or design?
Yes, of course we can
How to control the whole yogurt production line?
You can choose semi-automatic control or full-automatic control base on your actual demand and budget.
How long is the delivery time?
It takes about 60-90 days for whole yogurt production line manufacturing.
How to install and debug the yogurt production line?
After whole line equipment arrives at your factory and other support facilities in place , our company will send engineer team to the site for installation and debugging. If you have a professional team and can install by yourself, then our company can remotely install and debug through video with your team.
We have more than 20 years of experience in providing a wide range of professional services, providing our customers with complete processing lines and individual equipment.
NO.1301 Fengxing Road, Huaqiao Town, Kunshan City, Jiangsu Province.