Phone: +86-13816327892   E-mail: vonfo@ksvonfo.com

Professional Yogurt Turnkey Project Manufacturer

Over 15 years of yogurt production line design ,manufacture and installation experience
Top quality with reasonable price
Supports on-site or remote guided installation and commissioning
7X24 hours after-sales and technical support

Yogurt Production Line Description

Raw material of yogurt processing line
- Fresh milk or powdered milk
End product of yogurt milk processing line
- Stirred yogurt,which is fermented before filled into package
- Set-yogurt,which is fermented after filled into package
Processing Capacity of yogurt processing line
-1T/D - 500T/D
Ingredients used in yogurt processing line
-fruit materials, sugar or sweetener, and stabilizers(pectin, gelatin, starch, agar, etc.)
Container of yogurt processing line
-Bottles
-Plastic cups
-Plastic bags

Yogurt Production Line Flowchart

1.Raw milk storage system/milk powder and sugar dissolving system
2. Preparation and mixing system
3. Homogenization and pasteurization Section
4. Fermentation Section
5. Yogurt Filling & Packaging Section
6. CIP system
7. Water Treatment system
8. Ice water system
9. Compressed air system
10. Steam Boiler

Yogurt Production Line Key Machine

Fresh Milk Collection, Cooling and Storage System

( Fresh Milk As Raw Material)
-If your fresh milk capacity per day is low , then the milk cooling tank will be used for cooling and storage fresh milk .

-If your fresh milk capacity per day is high, then need use the plate heat
exchanger( PHE ) to cool down fresh milk to 4℃ and pump to milk storage tank

Milk Powder and Ingredients Dissolving System

(Milk Powder as Raw Material)
-Composed of mixing tank,high shear emulsification tank,water powder mixer and matched pumps, dissolving milk powder or ingredients with hot water .
- Ingredients dissolving system also needed when fresh milk as raw material

Yogurt Pasteurization System

-Composed of plate pasteurizer, homogenizer, and centrifuge separator(Optional by client).
-Cone equipment for whole yogurt processing line
-Fresh milk →55-65℃ homgeonzer/separator→90-95℃/300S pasteurization-43℃outlet
Yogurt fermentation system:
-Stirred yogurt will fermentation in fermentation tank at 41-43℃for 2-3 hours
-Set yogurt will fermentation after filled into package in fermentation chamber at 41-43℃for 2-3 hours

Yogurt Fermentation System

-Stirred yogurt will fermentation in fermentation tank at 41-43℃for 2-3 hours
-Set yogurt will fermentation after filled into package in fermentation chamber at 41-43℃for 2-3 hours

Yogurt Filling and Packing System

-Bottles(Most for set yogurt,filled in 40℃,send to fermentation chamber after filled )
-Plastic cups(Most for stirred yogurt,filled in 4-6℃)
-Plastic bags

CIP System for Yogurt Processing Line

-For clean whole pasteurized milk processing line after production finished
-Small scale whole-set type CIP system
-Separate type vertical CIP system

Why Choose VONFO Yogurt Processing Line

  • Professional Team
    A professional team with over 15 years of experience provides the most suitable yogurt production line design and manufacturing process.​​​​​​​
  • Reasonable Price and Top Quality​​​​​​​
    Provide factory direct sales prices based on the best quality to save your costs.​​​​​​​
  • Timely after-sales and Technical Support​​​​​​​
    7X24 hours, technical and after-sales support from a professional team​​​​​​​
  • Successful Cases​​​​​​​
    There are more than 100 sets dairy and beverage production line in normal operation around the world, including the United States, Europe, the Middle East and Africa, and the quality has been endorsed by customers.​​​​​​​

Cooperative Partner

SPX FLOW,GEA,Alfa Laval,Siemens,Omron,SpiraxSarco
Danone,coca-cola,Nestle,Heinz,Mengniu Dairy,Yili Group,Bright dairy,
WANT WANT,Master Kong
Big Easy Blends(USA),Forage project(USA), Mineral Logic( USA).
5 Star Drinks(Ghana), Fedek group(Ghana)

REQUEST A QUOTE NOW

24-hours-online professional pre-sales consultation, after-sales services & prompt feedback.
FAQs
  • How to choose suitable yogurt production line?
    Created with Sketch.
    形状 Created with Sketch.
    Based on capacity, packaged form and other requirements you provided, our engineers will design whole yogurt production line for you accordingly.
  • Can your factory produce yogurt production line according to our drawings or design?
    Created with Sketch.
    形状 Created with Sketch.
    Yes, of course we can
  • How to control the whole yogurt production line?
    Created with Sketch.
    形状 Created with Sketch.
    You can choose semi-automatic control or full-automatic control base on your actual demand and budget.
  • How long is the delivery time?
    Created with Sketch.
    形状 Created with Sketch.
    It takes about 60-90 days for whole yogurt production line manufacturing.
  • How to install and debug the yogurt production line?
    Created with Sketch.
    形状 Created with Sketch.
    After whole line equipment arrives at your factory and other support facilities in place , our company will send engineer team to the site for installation and debugging.
    If you have a professional team and can install by yourself, then our company can remotely install and debug through video with your team.
NO.1301 Fengxing Road, Huaqiao Town, Kunshan City, Jiangsu Province.
+86-18602119362 (Cell/WhatsApp)
+86-13816327892 (Cell/WhatsApp)

SUBSCRIBE

Sign up for our mailing list to get latest updates and offers.

PRODUCTS

CONTACT US
Contact us
Copyright © Kunshan vonfo machinery co.,ltd. All Rights Reserved.